Block F: Preventative and Predictive Maintenance, Commissioning and Decommissioning (16 questions)
Strategies
- Breakdown, preventive (time), predictive (condition), proactive (root causes). CMMS keeps history; MTBF measures reliability.
- Repeat failures need root cause analysis.
Vibration
- 1X radial = unbalance. 1X and 2X with high axial = misalignment. Many harmonics = looseness.
- Non-synchronous high frequency = bearing defect (shows first in acceleration). Gear mesh = teeth x r/min.
- 120 Hz that stops instantly at power off = electrical. Big peak at a natural frequency = resonance.
- Same points, same directions, same mounting for trends. Check dirt, wear and looseness before balancing.
Other monitoring
- Thermography: hot spots. Ultrasound: leaks and correct greasing. Oil analysis: wear metals, contamination, condition.
- NDT: dye penetrant any non-porous metal; magnetic particle ferromagnetic only; ultrasonic thickness from one side.
Commissioning and decommissioning
- Before first start: alignment, lubrication, rotation uncoupled, guards, piping supported, hand-turn the shaft.
- Flush new hydraulics. Record baselines. Light load first after an overhaul. Punch list and turnover.
- Decommission: lock out first; drain and dispose of fluids by the rules; dry, protect, cap, label; turn stored shafts periodically.
Independent study guide. Not affiliated with or endorsed by the Red Seal Program or any apprenticeship authority.